A step-by-step construction AI fit, value and readiness self-review that shows where AI is strong, marginal or low value.
Keep the complete branded version for internal review and implementation.
Download the PDFHow to Use This Self-Review
This is not a test of whether your construction company is “good at AI.” It is a structured discovery process. The objective is to prevent two equally expensive mistakes: forcing AI into work where it adds little value, and overlooking high-value work where AI could materially improve speed, quality, consistency, capacity or decision-making.
Use this workbook on real construction workflows, not abstract ideas. Include the people who perform the work today: owners, estimators, project managers, coordinators, superintendents, business-development staff, accounting/admin and field leadership as appropriate. Score each candidate workflow independently because AI may be highly valuable in one part of a contractor's operation and nearly useless in another.
Complete the review with the people who actually understand the work. For a small company, that may be the owner, one manager and one frontline employee. For a larger organization, include the process owner, a finance representative, an IT/security representative and at least one person who performs the work today.
The scoring scale
Do not award a high score because AI sounds promising. Award it only when the underlying business facts support the score. If the answer is unknown, score it as 1 or 2 and list what must be verified.
Final outputs
- AI Alignment Index (0-100)
- AI Readiness Score (0-100)
- Value Potential Score (0-100)
- Risk / Constraint Score (0-100)
- Opportunity classification for each workflow: Strong, Conditional, Marginal, or Little/No Value
- Recommended implementation mode: assist, draft, analyze, automate, agentic workflow, or do not implement
- A 30/60/90-day next-action plan based on the scores
Step 1 – Define the Construction Business Outcome Before Mentioning AI
Start with the outcome. AI is a means, not a strategy. The most reliable implementations begin by defining a measurable construction business result and only then asking whether AI is the right tool.
Business outcome discovery
Outcome statement worksheet
Step 2 – Identify the Work Characteristics
AI is most useful when the nature of the work matches what current AI systems do well: language, pattern recognition, classification, summarization, extraction, generation, search, prediction, decision support and controlled execution across software tools. It is less useful when the work is already trivial, purely physical, highly deterministic, extremely rare, or requires accountability that cannot be delegated.
Work-pattern fit
Red flags that reduce AI fit
- The task occurs only a few times per year and has little financial consequence.
- The task is already completed in seconds with a reliable deterministic rule.
- The work is almost entirely physical with little information processing.
- No one can define what a correct output looks like.
- Errors would be catastrophic and cannot be caught before harm occurs.
- The process is so unstable that the steps change every week.
- The data required is legally or contractually unavailable to the system.
Step 3 – Quantify the Pain and Economics
AI should compete against the cost of doing nothing and against simpler alternatives. A process can be technically automatable and still be a poor investment.
Economic significance
Simple value model
Estimate annual addressable value before estimating AI savings. Use conservative assumptions.
Step 4 – Check the Data and Knowledge Foundation
AI quality is constrained by the information it can legitimately access. The best model cannot compensate for missing, contradictory, stale or inaccessible source material.
Data and knowledge readiness
Data inventory
Step 5 – Determine the Correct AI Job
Different problems call for different levels of AI. Many weak implementations fail because they jump directly to an autonomous agent when a search assistant, drafting tool or classification model would have delivered most of the value with less cost and risk.
Implementation level selector
Authority and autonomy check
Step 6 – Evaluate the Human Factor
AI adoption succeeds or fails through people. The technical system may work perfectly and still produce no ROI if employees do not trust it, managers do not change the workflow, ownership is unclear or the organization expects the AI to replace judgment it cannot responsibly replace.
Human adoption readiness
Human-role design
Step 7 – Assess Risk, Consequence and Reversibility
The right question is not whether AI can make mistakes. Every system and every human can. The right question is whether mistakes can be detected, contained, reversed and prevented from becoming unacceptable business outcomes.
Control and recoverability
Consequence classification
Step 8 – Check Technical and Operational Feasibility
Technical feasibility
Build vs. buy checkpoint
Prefer the simplest layer that can reliably achieve the outcome. A subscription product may be enough. Custom orchestration may be justified when the workflow spans multiple systems, requires proprietary knowledge, needs specialized controls or produces enough value to support ongoing maintenance.
Step 9 – Estimate the Full Cost of AI Ownership
Subscription price or token cost is only one part of the economics. Include implementation, integration, training, governance, monitoring, maintenance, human review and failure handling.
ROI worksheet
Step 10 – Score the AI Alignment Index
Use the section scores below. Convert each section to a percentage, then apply the weight. The weighted total is the AI Alignment Index.
AI Alignment Index interpretation
Step 11 – Build the AI Opportunity Map
Score each candidate workflow separately. The goal is not to prove that your construction company “needs AI.” The goal is to locate the specific places where AI is economically and operationally justified.
Decision labels
Step 12 – Identify Where AI Is Most Likely to Benefit You
The following patterns tend to produce the strongest returns when the underlying process is well defined and controlled.
High-value patterns
- High-volume document reading, extraction or classification
- Research that requires combining many sources
- Routine drafting with repeatable standards
- Internal knowledge retrieval across scattered files
- Customer or employee questions with bounded approved answers
- Lead or opportunity research and prioritization
- Quality assurance and exception detection
- Meeting, email and project-status synthesis
- Workflow coordination, reminders and handoffs
- Coding, data transformation and repetitive digital work
- Analysis where humans need faster access to patterns and explanations
Often marginal
- Occasional creative brainstorming with no downstream value
- Tasks completed only a few times per year
- Low-volume processes where human effort is already trivial
- Automation that saves minutes but requires significant maintenance
- Using an expensive frontier model for simple deterministic work
- Adding AI to a process that has not first been simplified
Little or no value today
- Work that is already reliably automated by rules at lower cost
- Purely physical work with no meaningful information component
- Decisions where accountability cannot be delegated and AI adds no analytical advantage
- Tasks with no accessible data or trustworthy source material
- Processes with no measurable problem, owner or business outcome
- Use cases where the cost of verification exceeds the cost of doing the work manually
- Autonomous actions where consequences are severe and adequate controls are unavailable
Step 13 – Compare AI With the Alternatives
Responsible AI adoption includes deciding not to use AI when another approach is better. Compare every proposed AI project against the simplest credible alternative.
Alternative comparison worksheet
Step 14 – Apply the “Ready to Pilot?” Gate
Before spending implementation money, all of the following should be true or explicitly accepted as a controlled experiment.
- ☐ The problem and success metric are written down.
- ☐ A current baseline exists.
- ☐ A process owner is named.
- ☐ The pilot population, data set or workflow boundary is limited.
- ☐ Approved data sources are defined.
- ☐ Prohibited data and prohibited actions are defined.
- ☐ Human review requirements are defined.
- ☐ Logging and evidence requirements are defined.
- ☐ A failure / rollback path exists.
- ☐ A cost ceiling is set.
- ☐ The pilot has a start and end date.
- ☐ At least one frontline user participates.
- ☐ The organization knows what result would cause it to stop, modify or scale the pilot.
Step 15 – Final Self-Review Scorecard
Required written conclusion
AI is most likely to help us by: ________________________________________________________________________________ ________________________________________________________________________________
The three highest-value workflows are: ________________________________________________________________________________ ________________________________________________________________________________
The areas where AI is only marginally useful are: ________________________________________________________________________________ ________________________________________________________________________________
The areas where AI currently provides little or no value are: ________________________________________________________________________________ ________________________________________________________________________________
The largest prerequisite we must solve before implementation is: ________________________________________________________________________________ ________________________________________________________________________________
The largest human / organizational risk is: ________________________________________________________________________________ ________________________________________________________________________________
The largest technical / governance risk is: ________________________________________________________________________________ ________________________________________________________________________________
The first controlled pilot should be: ________________________________________________________________________________ ________________________________________________________________________________
The metric that will determine whether the pilot worked is: ________________________________________________________________________________ ________________________________________________________________________________
The condition that would cause us to stop the project is: ________________________________________________________________________________ ________________________________________________________________________________
What Your Final Result Means
Profile A – Strong AI Candidate
You have a meaningful business problem, repeatable information work, accessible data, measurable economics, manageable risk and people who can own the change. Your next step is not a company-wide rollout. It is a bounded pilot that proves performance, cost, controls and user adoption before scale.
Profile B – AI Can Help, But Only in Parts
The workflow contains useful AI tasks, but end-to-end automation is not justified. Focus on search, summarization, drafting, extraction, analysis or decision support while keeping humans responsible for consequential actions. This profile often produces excellent ROI because it captures most of the value without paying for unnecessary autonomy.
Profile C – Marginal Value
The technology may work, but the economics, volume, data quality or process maturity are weak. Use AI only if it comes cheaply inside tools you already use, or run a very small experiment. Do not build custom infrastructure until the business case improves.
Profile D – AI Is Not the Right Tool Right Now
This is a successful discovery outcome, not a failure. You have avoided spending money on a poor fit. Improve the workflow, data, ownership or conventional automation first. Reassess later if conditions change.
Profile E – Valuable but High-Risk
AI could create significant value, but the consequences of error are too serious for broad autonomy. Use AI as an analyst, researcher, drafter or recommendation engine with strong human approval, least-privilege access, logging and clear escalation. Scale authority only after evidence supports it.
Your 30 / 60 / 90-Day Action Plan
First 30 days – Prove the use case
- Select one high-scoring workflow.
- Measure the current baseline.
- Map the actual process with frontline users.
- Choose the lowest-authority AI approach capable of testing the hypothesis.
- Define approved data and prohibited actions.
- Run test cases including failures and edge cases.
- Measure quality, time saved, cost and user acceptance.
Days 31-60 – Stabilize the operating model
- Document the revised workflow.
- Train users on verification and escalation.
- Add logging, access controls and cost monitoring.
- Track false positives, false negatives, hallucinations and exception types.
- Fix root causes instead of adding manual patches.
- Compare actual benefit to the original ROI model.
Days 61-90 – Decide whether to scale
- Scale only if measured benefit exceeds total operating cost.
- Increase autonomy only when evidence supports it.
- Create ownership for ongoing maintenance.
- Add the use case to governance and change-control routines.
- Retire duplicate manual steps when the AI-enabled workflow is proven.
- Document lessons before beginning the next use case.
One-Page Executive Decision Summary
Executive decision
- ☐ Proceed to pilot
- ☐ Proceed after prerequisites
- ☐ Use AI assist only
- ☐ Marginal – no dedicated investment
- ☐ Do not implement AI for this use case
Decision rationale: ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________
Closing Principle
AI adoption should not begin with “Which model should we buy?” It should begin with “What outcome are we trying to improve, what is that outcome worth, and what is the least complex system that can reliably improve it?”
A responsible implementation earns additional authority through evidence. It starts narrow, measures real outcomes, preserves human accountability, controls access and cost, and expands only after the system proves that it produces more value than complexity.
Catha Construction Services Practical AI Adoption | Governance | Implementation | ROI
Construction Applications
Examples worth scoring include lead qualification, bid research, estimate document review, RFI/submittal preparation, project correspondence, meeting/action-item extraction, subcontractor follow-up, customer updates, closeout, safety-document retrieval, job-cost reporting and management dashboards. Physical craft work, final safety judgments, contractual commitments and highly deterministic tasks may score much lower.
| Purpose of this review: By the end, you will have a scored AI Alignment Index, a prioritized list of strong-fit opportunities, a list of marginal uses that need proof before investment, and a clear record of areas where AI is unlikely to justify the cost, risk or disruption. |
|---|
| Score | Meaning |
|---|---|
| 0 | Not true / not applicable / no evidence |
| 1 | Rarely true; weak fit or major constraints |
| 2 | Partly true; mixed fit; substantial uncertainty |
| 3 | Mostly true; good fit; manageable constraints |
| 4 | Strongly true; clear fit; evidence available |
| Important: A high AI-fit score does not mean “automate everything.” It means the process deserves a controlled experiment. The correct implementation may still be a human using an AI assistant rather than an autonomous agent. |
|---|
| # | Question | Score 0-4 | Notes / Evidence |
|---|---|---|---|
| 1 | Can we state the business problem in one sentence without using the words AI, automation, bot, model or agent? | ||
| 2 | Does the problem create measurable cost, delay, lost revenue, quality issues, risk, customer friction or employee burden? | ||
| 3 | Is the outcome important enough that leadership would care if it improved by 20-30%? | ||
| 4 | Can we name the person who owns the outcome? | ||
| 5 | Do we have a current baseline such as hours, cost, error rate, turnaround time, conversion rate, backlog, rework or revenue? | ||
| 6 | Can we define what “better” means numerically? | ||
| 7 | Would solving this problem still matter if AI did not exist? | ||
| 8 | Can the value be observed within 30-90 days of a pilot? |
| Interpretation: If this section scores below 20 out of 32, stop. The use case is not defined well enough to evaluate AI. Clarify the business problem before selecting technology. |
|---|
| Field | Your answer |
|---|---|
| Current problem | |
| Who experiences it | |
| Current process owner | |
| Baseline metric | |
| Target metric | |
| Financial or operational impact | |
| Decision date / urgency |
| # | Question | Score 0-4 | Notes / Evidence |
|---|---|---|---|
| 1 | The work involves reading, writing, searching, summarizing, comparing, classifying, extracting, translating or interpreting information. | ||
| 2 | The work contains repeatable patterns even if every case is not identical. | ||
| 3 | The work requires combining information from multiple sources. | ||
| 4 | Employees spend material time moving information between systems. | ||
| 5 | There is a backlog, delay, queue or throughput constraint. | ||
| 6 | The work involves a large volume of similar decisions or documents. | ||
| 7 | The process includes routine communications, follow-ups or status updates. | ||
| 8 | The work requires identifying exceptions rather than manually inspecting every case. | ||
| 9 | The work benefits from 24/7 availability or faster response. | ||
| 10 | The process is currently dependent on one person’s memory or tribal knowledge. | ||
| 11 | The task can be reviewed after AI performs it before irreversible action occurs. | ||
| 12 | The work can be broken into steps with clear inputs, outputs and decision points. |
| # | Question | Score 0-4 | Notes / Evidence |
|---|---|---|---|
| 1 | We can estimate the number of labor hours spent on this process per month. | ||
| 2 | We know the loaded hourly cost of the people doing the work. | ||
| 3 | We can estimate rework, error, delay or missed-opportunity cost. | ||
| 4 | The process affects revenue, margin, cash flow, customer retention or capacity. | ||
| 5 | The annual economic impact is large enough to justify implementation effort. | ||
| 6 | If AI reduced the work by 25%, the savings or gain would be meaningful. | ||
| 7 | If AI improved response time or consistency, that improvement would have measurable value. | ||
| 8 | There are secondary benefits such as better records, fewer dropped tasks, faster onboarding or management visibility. |
| Value category | How to estimate |
|---|---|
| Labor cost | Monthly hours x loaded hourly rate x 12 |
| Error / rework cost | Annual incidents x average cost per incident |
| Delay cost | Value lost from waiting, backlog or slow decisions |
| Revenue opportunity | Qualified opportunities lost or delayed x realistic contribution margin |
| Capacity value | Additional work possible without equivalent headcount growth |
| Risk avoidance | Expected annual loss reduction; use probability-weighted values |
| Conservative rule: Do not credit 100% of addressable value to AI. For early planning, model 10%, 25% and 40% improvement scenarios. If the project still makes sense at 10-25%, it is much more likely to be worth piloting. |
|---|
| # | Question | Score 0-4 | Notes / Evidence |
|---|---|---|---|
| 1 | The information needed for the task exists in digital form. | ||
| 2 | The relevant information can be located reliably. | ||
| 3 | Source documents are reasonably current and authoritative. | ||
| 4 | Access permissions can be defined by role or user. | ||
| 5 | We know which systems contain the authoritative record. | ||
| 6 | The information is not dominated by scans, handwriting or poor-quality images. | ||
| 7 | We can separate confidential, regulated or customer-restricted data from unrestricted data. | ||
| 8 | We can identify data that must never be sent to an external model provider. | ||
| 9 | We can retain an audit trail of what information was used when needed. | ||
| 10 | We can correct source data when errors are found. |
| Source | Authoritative? | Access / sensitivity notes |
|---|---|---|
| Email / messages | ||
| Documents / PDFs | ||
| CRM / ERP | ||
| Spreadsheets / databases | ||
| Website / public sources | ||
| Images / drawings | ||
| Recorded calls / meetings | ||
| Other |
| AI job | Best for | Examples |
|---|---|---|
| Search / retrieval | Find the right information from approved sources | Policy lookup, project history, knowledge base |
| Summarization | Condense large amounts of information | Meeting recap, bid package summary, inbox digest |
| Extraction / classification | Turn unstructured material into fields or categories | Invoice data, contract clauses, lead classification |
| Drafting / generation | Create first drafts for human review | Emails, proposals, reports, scope narratives |
| Analysis / decision support | Compare options, detect patterns, explain implications | Risk review, estimate variance, pipeline analysis |
| Workflow automation | Move information and trigger predefined steps | Routing, reminders, data synchronization |
| Agentic execution | Plan and execute multi-step work using tools | Research + draft + record + follow-up under controls |
| Prediction / optimization | Estimate future outcomes from data | Demand, failure likelihood, schedule risk |
| # | Question | Score 0-4 | Notes / Evidence |
|---|---|---|---|
| 1 | Could a read-only AI assistant provide most of the desired value? | ||
| 2 | Does a human need to approve the output before it is used? | ||
| 3 | Can deterministic automation handle part of the workflow without AI? | ||
| 4 | Does the process require the AI to take actions in external systems? | ||
| 5 | Would autonomous action create meaningful legal, financial, safety or reputational exposure? | ||
| 6 | Can every action be logged and reversed where practical? | ||
| 7 | Can authority be limited by dollar amount, action type, data source, recipient or system? | ||
| 8 | Is there a clear escalation path when the AI is uncertain? |
| # | Question | Score 0-4 | Notes / Evidence |
|---|---|---|---|
| 1 | The people who perform the work agree that the problem is real. | ||
| 2 | At least one respected frontline user is willing to test the new process. | ||
| 3 | Managers will change the workflow rather than merely adding AI on top of the old workflow. | ||
| 4 | Employees understand that the purpose is to improve outcomes, not simply reduce headcount. | ||
| 5 | Users can be trained in when to trust, verify, correct or reject AI output. | ||
| 6 | The organization has a named process owner after implementation. | ||
| 7 | Someone is accountable for reviewing failures and improving the system. | ||
| 8 | There is enough management attention to measure adoption and outcomes. | ||
| 9 | Employees have a safe way to report incorrect or risky AI behavior. | ||
| 10 | The implementation includes role changes, SOP updates and training – not just software access. |
| Mode | Meaning | When appropriate |
|---|---|---|
| Human in the loop | Human approves each consequential output/action | Use when consequences are material or AI reliability is not proven |
| Human on the loop | AI performs routine work; human monitors exceptions and samples | Use after performance is measured and controls are proven |
| Human over the loop | Human sets policy, limits and audit rules; system operates within them | Use only for mature, well-bounded workflows |
| Human only | AI may inform but should not decide or execute | Use for accountability-heavy, sensitive or low-value cases |
| # | Question | Score 0-4 | Notes / Evidence |
|---|---|---|---|
| 1 | An incorrect output can usually be detected before external harm occurs. | ||
| 2 | Most actions can be reversed or corrected. | ||
| 3 | The AI can be restricted from spending money, signing agreements or making binding commitments unless explicitly approved. | ||
| 4 | The AI can be prevented from exposing confidential data to unauthorized recipients. | ||
| 5 | External communications can be reviewed or limited by policy. | ||
| 6 | We can log inputs, outputs, tool calls and material actions. | ||
| 7 | We can disable the AI quickly if abnormal behavior occurs. | ||
| 8 | High-risk cases can be routed to a human automatically. | ||
| 9 | Compliance or contractual obligations have been identified. | ||
| 10 | We can define prohibited actions in plain language and enforce them technically where possible. |
| Level | Typical consequence | Default posture |
|---|---|---|
| Low | Minor inconvenience; easy correction; no external commitment | Broader automation can be considered after testing |
| Moderate | Customer impact, rework or limited financial impact | Human review or strong exception controls |
| High | Legal, safety, material financial, employment, regulated or reputational consequence | Human approval and strict authority boundaries |
| Critical | Potential severe injury, binding commitment, large financial transfer, major regulatory exposure | AI should assist only unless specialized controlled system is formally approved |
| # | Question | Score 0-4 | Notes / Evidence |
|---|---|---|---|
| 1 | The systems involved have APIs, exports, integrations or stable browser workflows. | ||
| 2 | Authentication can be handled securely without shared passwords. | ||
| 3 | The process can operate with least-privilege access. | ||
| 4 | We can create a test environment or safe pilot scope. | ||
| 5 | Existing systems can provide the data at the required speed and frequency. | ||
| 6 | We can monitor usage, failures and costs. | ||
| 7 | We can version prompts, rules, workflows or configurations. | ||
| 8 | We can recover from partial failures without duplicating actions. | ||
| 9 | We can identify system ownership for each integration. | ||
| 10 | The solution can be maintained by someone after the initial builder leaves. |
| Approach | Use when |
|---|---|
| Use an existing AI product | Common workflow; standard features; limited integration; fast deployment |
| Configure no-code / low-code | Moderate workflow integration; predictable steps; manageable scale |
| Custom AI workflow | Proprietary process; multiple systems; specialized logic or controls |
| Agentic system | Multi-step planning and execution produces material value and boundaries are enforceable |
| Do not automate | Weak economics, unacceptable risk, poor data, unstable process or no owner |
| Cost category | Include |
|---|---|
| Software subscriptions | Per-user AI tools, automation tools, connectors, databases, monitoring |
| Model usage | API tokens, image/audio/video generation, embeddings, reranking |
| Implementation labor | Discovery, workflow design, integrations, testing, data cleanup |
| Human review | Approvals, quality assurance, exception handling |
| Governance / security | Access controls, audits, policies, logging, vendor review |
| Training / change management | User training, SOP changes, management communication |
| Maintenance | Prompt/workflow updates, API changes, model changes, new edge cases |
| Failure cost | Duplicate actions, incorrect outputs, recovery time, customer remediation |
| Metric | Estimate |
|---|---|
| Annual addressable value | $ |
| Expected improvement % | % |
| Expected gross annual benefit | $ |
| Annual recurring AI cost | $ |
| Annual human oversight cost | $ |
| Annual maintenance allowance | $ |
| Net annual benefit | $ |
| One-time implementation cost | $ |
| Estimated payback period | months |
| Decision rule: Do not rely on a single optimistic forecast. Calculate conservative, expected and upside cases. For a first implementation, a project that only works in the upside case is usually not ready. |
|---|
| Category | Weight | Weighted points |
|---|---|---|
| 1. Business outcome clarity | 10 | Section score / maximum x 10 |
| 2. Work-pattern fit | 15 | Section score / maximum x 15 |
| 3. Economic significance | 15 | Section score / maximum x 15 |
| 4. Data / knowledge readiness | 10 | Section score / maximum x 10 |
| 5. AI job / authority fit | 10 | Section score / maximum x 10 |
| 6. Human adoption readiness | 15 | Section score / maximum x 15 |
| 7. Control / recoverability | 10 | Section score / maximum x 10 |
| 8. Technical feasibility | 10 | Section score / maximum x 10 |
| 9. Cost / ROI confidence | 5 | Use financial worksheet and confidence assessment |
| Score | Classification | What it means |
|---|---|---|
| 85-100 | STRONG ALIGNMENT | High-priority candidate. Proceed to controlled pilot if no critical risk gate fails. |
| 70-84 | GOOD / CONDITIONAL ALIGNMENT | Likely useful, but one or more constraints should be resolved before scaling. |
| 55-69 | MARGINAL ALIGNMENT | AI may help selected steps. Use a narrow experiment; avoid broad automation. |
| 40-54 | WEAK ALIGNMENT | Benefits are uncertain relative to cost, complexity or risk. Consider simpler automation or process improvement first. |
| 0-39 | LITTLE TO NO CURRENT VALUE | Do not implement AI for this workflow now. Revisit only if the process, data, economics or technology materially changes. |
| Mandatory override: A high total score does not override a critical risk. If the use case involves unacceptable safety, legal, privacy, financial or contractual exposure that cannot be controlled, classify it as “Human only / AI assist” regardless of the numeric score. |
|---|
| # | Workflow / Use Case | Fit | Value | Risk | Recommended Mode | Decision |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 |
| Decision | Meaning | Next action |
|---|---|---|
| IMPLEMENT / PILOT | Strong alignment; clear value; acceptable risk | Run a measured pilot with success criteria |
| CONDITIONAL | Good fit but prerequisite exists | Resolve data, integration, ownership or control issue first |
| ASSIST ONLY | AI useful, autonomy not justified | Use search, analysis, drafting or recommendations with human decision |
| MARGINAL | Some benefit but weak economics or limited scale | Use only if nearly free or embedded in existing tools |
| DO NOT IMPLEMENT | Little value or unacceptable risk | Improve process or use conventional software instead |
| Alternative | Ask whether this solves the problem first |
|---|---|
| Process redesign | Remove unnecessary steps, approvals, duplicate entry or handoffs |
| Conventional automation | Rules, scripts, macros, workflow engines, RPA |
| Better software configuration | Use features already available in ERP/CRM/accounting/project systems |
| Template / checklist | Standardize judgment before automating it |
| Training / staffing change | Solve a capability or ownership problem directly |
| AI assistant | Add intelligence while keeping human action |
| AI workflow / agent | Use only when multi-step intelligence and execution create additional value |
| Option | Annual Cost | Expected Benefit | Risk | Comments |
|---|---|---|---|---|
| Manual / current process | ||||
| Process redesign | ||||
| Conventional automation | ||||
| Existing software feature | ||||
| AI assistant | ||||
| AI workflow / agent |
| If three or more boxes are unchecked: Do not begin production implementation. Complete discovery and pilot design first. |
|---|
| Measure | Result | Notes |
|---|---|---|
| AI Alignment Index | /100 | |
| AI Readiness Score | /100 | |
| Value Potential | /100 | |
| Human Adoption Readiness | /100 | |
| Risk / Constraint Severity | /100 (higher = more risk) | |
| ROI Confidence | Low / Medium / High | |
| Recommended implementation level | Assist / Draft / Analyze / Automate / Agent / None | |
| Overall decision | Strong / Conditional / Marginal / Little-No Value |
| Catha principle: The objective is not maximum AI. The objective is the minimum amount of AI, authority, complexity and recurring cost required to produce the desired business outcome reliably. |
|---|
| Decision field | Answer | Evidence / Notes |
|---|---|---|
| Business problem | ||
| Current annual cost / impact | ||
| AI Alignment Index | ||
| Expected annual benefit | ||
| Expected annual operating cost | ||
| Implementation cost | ||
| Payback estimate | ||
| Primary human owner | ||
| Primary risk | ||
| Required human oversight | ||
| Pilot scope | ||
| Success metric | ||
| Scale decision date |
| The best possible result of this review may be “yes,” “partly,” or “not here.” All three answers are useful when they are based on evidence. The purpose of AI strategy is not to maximize adoption. It is to allocate technology to the places where it creates real, defensible business value. |
|---|
Practical questions construction owners ask.
What does the self-review produce?
An AI Alignment Index, AI Readiness Score, Value Potential Score and Risk/Constraint Score (each 0-100), an opportunity classification and recommended implementation mode for each workflow, and a 30/60/90-day next-action plan.
How should we score an answer we do not know?
Score it as 1 or 2 and list what must be verified. Award a high score only when the underlying business facts support it.
Who should take part in the review?
The people who actually understand the work. For a small company that may be the owner, one manager and one frontline employee; larger organizations should add the process owner, finance, IT/security and someone who performs the work today.